Overall Progress
Complete
Behind Schedule
Overall Progress
0%
Current Phase
صب القواعد
0% · In Progress
Project Duration
245 Days
60% of time elapsed
Days Remaining
99
14 Feb 2027
Schedule Status
Behind Schedule
-53.2 points vs plan
Progress is calculated from the weighted completion of every task in every phase.
Behind Schedule
This project is running behind its plan.
The planned line is derived from the phase schedule. The actual line comes from progress recorded with each field update.
Open a phase to see the tasks it contains.
تجهيز اورق الأرض-تجهيز تراخيص البناء-تجهيز المخططات-تجهيز العقد مع المقاول-تجهيز الأرض-حفر القواعد-تركيب حديد وخشب القواعد-صب القواعد
No tasks have been recorded for this phase yet.
No tasks have been recorded for this phase yet.
No tasks have been recorded for this phase yet.
No tasks have been recorded for this phase yet.
No tasks have been recorded for this phase yet.
Project started
Planned completion
Current phase
صب القواعد · 0%
Nothing to show yet.
الوصفصصصص
No photographs have been published yet.
بناء مركز صحي بمساحة 300 م2 لتقديم خدمات الرعاية الصحية الأولية لسكان بلدة مجدليا والقرى المجاورة والبلغ عددهم 25000 شخص اهم الاعمال هي : • أعمال الحفريات والتسوية. • أعمال البيتون العادي والمسلح. • بناء الجدران (بلوك إسمنتي). • اعمال الزريقة • اعمال تلبيس حجر • اعمال دهان • أعمال العزل. • أعمال الإكساء الداخلي والخارجي. • تنفيذ الأرضيات. • تنفيذ التمديدات الصحية. • تنفيذ التمديدات الكهربائية. • تركيب الأبواب والنوافذ. • تجهيز دورات المياه. • تركيب منظومة طاقة شمسية.
Nothing to show yet.